After weeks of delays that resulted from an appeal, the Halifax developer behind the vacant Bloomfield site has complied with a direct order from the city to conduct a structural assessment of the building.
This month’s deep freeze has been followed by thawing temperatures, and avalanche risks have been considerable for much of the past week — now, forecasters say even warmer temperatures are on the way, raising the risk.